RDC Installs New Pedestrian Bridge
May 6th, 2010A new 200-foot long pedestrian bridge to span Court Avenue was delivered to the Memphis riverfront and installed on April 29, 2010.
A new 200-foot long pedestrian bridge to span Court Avenue was delivered to the Memphis riverfront and installed on April 29, 2010.