Cost Estimate

The preliminary order-of-magnitude cost estimate is for the Harbor, Land Bridge, parks, recreation, greenways, and utilities and unit costs. Significant additional design and engineering work will be necessary to refine the cost estimate. These cost estimates were prepared based on Master Plan level information and will be updated as the infrastructure projects reach more detailed states of design and engineering. The estimates are adequate for purposes of preparing an Infrastructure Framework Plan, but the expected changes in the estimates as better information becomes available will require adjustments to calculation of fees and allocation of costs to various funding sources.

I. Downtown Harbor  
  Riverwalk Esplanade $2,111,000
  Public Stairs and Access $3,885,000
  Union Avenue Bridge $5,265,000
  Amphitheater $2,328,500
  Cobblestones $6,780,000
  Terraced Gardens and Riverwalk $9,883,200
  Beale Street Landing $10,375,000
  Total $40,627,700
II. Riverfront Parks  
  Extension of Greenbelt Park $7,200,000
  Point Park $21,586,400
  South End of Mud Island $14,900,000
  Lake Park $10,560,000
  Tom Lee Park Improvements $5,000,000
  Riverwalk and Park Improvements $5,000,000
  Total $64,246,400
III. Land Bridge  
  Landfill (to rough grade) $64,000,000
  Streets, Infrastructure, Landscape $9,230,000
  Extension of Island Drive $2,250,000
  Canal and Canal Street $2,560,000
  Total $78,040,000
IV. North End Lake  
  Lake Basin and Poplar 11,250,000
  Pump Stations $6,300,000
  Total $17,550,000
  Total Construction Cost $200,464,100
V. Property Acquisition and Relocation $ 25,000,000
  Landfill (to rough grade) $64,000,000
  Grand Total $225,464,100